National Repository of Grey Literature 6 records found  Search took 0.01 seconds. 
Family house
Staníková, Radka ; Majsniar, Michal (referee) ; Škramlik, Jan (advisor)
The subject of this diploma work is the new building of a family house at Boží Dar town, that is situated in the mountain resort. The family house has a cellar, it is two storied with an attic apartment. The building is devided into three units . The first unit is found on the first floor and is designed as an apartment. The other units are situated in the attic and are designed for a short-term or long-term renting. The house is designed of cut bricks with a ceramic ceiling construction. The perimeter wall is thermally insulated with a contact insulating system and partly covered with a stony facing. There is a saddle-shaped roof on the house. The building site is sloping north-east. All constructions are in accordance with the valid regulations and ČSN standards.
The Multifunctional House
Pánek, Martin ; Struhala, Karel (referee) ; Manychová, Monika (advisor)
The main concern of this thesis is to design a five-storey multifunctional house. The house is divided into the main living area to which it belongs especially residential units accessible by stairs from the ground floor and also basement boxes and room for prams. On the ground floor are also located the individual garage, store room and technology. The house has four floors and a basement, the basement are located mass garages. The house has a sloping wooden roof trusses.
Detached house
Tyrlik, Radim ; Šteffek, Libor (referee) ; Kolář, Radim (advisor)
Abstract The subject of this thesis is the process of building technical part of the project documentation for the realization of a new family house in Třinec, Oldřichovice, parcel number. 3330/2. The building is located in the village of Třinec, in sparsely built-up area and will be surrounded by buildings from the north and east sides. Along the southern and western parts of the property there is a local road (N.P. 3340/5) which is 6 meters wide. On the north side is undeveloped parcel (N.P. 3344/4) and parcel (N.P. 161). In the northeast, there is a built family house with land (N.P. 65/1). The construction is formed by one building and it will not be splitted into other objects. The house has symmetrical L-shaped floor plan and it has got a partial basement. Vertical load-bearing masonry is made of Calcium silicate molded bricks Silka S12-1800 10 DF, (thickness 300 mm), basement walls are made of the same material as the aboveground storay. Partition walls are made of calcium silicite moped bricks Silka S20-2000 5 DF. The ceiling is made as monolithic-prefabricated, mounted ceiling Porotherm with ceiling beams and bars. The roof holding is supported by truss structure with wood and steel components. The building will be based on the foundation strips, simple foundation ratios. The parcel is situated in hilly terrain, vertical rise of the terrain is 6 meters. Roofing is made by a hipped roof with a slope of 35 °. Groundwater is located 8.9 m below the existing ground. It will therefore not affect the construction. The volume activity of radon 1.LOW DEGREE
The Multifunctional House
Pánek, Martin ; Struhala, Karel (referee) ; Manychová, Monika (advisor)
The main concern of this thesis is to design a five-storey multifunctional house. The house is divided into the main living area to which it belongs especially residential units accessible by stairs from the ground floor and also basement boxes and room for prams. On the ground floor are also located the individual garage, store room and technology. The house has four floors and a basement, the basement are located mass garages. The house has a sloping wooden roof trusses.
Family house
Staníková, Radka ; Majsniar, Michal (referee) ; Škramlik, Jan (advisor)
The subject of this diploma work is the new building of a family house at Boží Dar town, that is situated in the mountain resort. The family house has a cellar, it is two storied with an attic apartment. The building is devided into three units . The first unit is found on the first floor and is designed as an apartment. The other units are situated in the attic and are designed for a short-term or long-term renting. The house is designed of cut bricks with a ceramic ceiling construction. The perimeter wall is thermally insulated with a contact insulating system and partly covered with a stony facing. There is a saddle-shaped roof on the house. The building site is sloping north-east. All constructions are in accordance with the valid regulations and ČSN standards.
Detached house
Tyrlik, Radim ; Šteffek, Libor (referee) ; Kolář, Radim (advisor)
Abstract The subject of this thesis is the process of building technical part of the project documentation for the realization of a new family house in Třinec, Oldřichovice, parcel number. 3330/2. The building is located in the village of Třinec, in sparsely built-up area and will be surrounded by buildings from the north and east sides. Along the southern and western parts of the property there is a local road (N.P. 3340/5) which is 6 meters wide. On the north side is undeveloped parcel (N.P. 3344/4) and parcel (N.P. 161). In the northeast, there is a built family house with land (N.P. 65/1). The construction is formed by one building and it will not be splitted into other objects. The house has symmetrical L-shaped floor plan and it has got a partial basement. Vertical load-bearing masonry is made of Calcium silicate molded bricks Silka S12-1800 10 DF, (thickness 300 mm), basement walls are made of the same material as the aboveground storay. Partition walls are made of calcium silicite moped bricks Silka S20-2000 5 DF. The ceiling is made as monolithic-prefabricated, mounted ceiling Porotherm with ceiling beams and bars. The roof holding is supported by truss structure with wood and steel components. The building will be based on the foundation strips, simple foundation ratios. The parcel is situated in hilly terrain, vertical rise of the terrain is 6 meters. Roofing is made by a hipped roof with a slope of 35 °. Groundwater is located 8.9 m below the existing ground. It will therefore not affect the construction. The volume activity of radon 1.LOW DEGREE

Interested in being notified about new results for this query?
Subscribe to the RSS feed.